
Above all,
a sound roof.
From a leaking junction to a renewed roof. Start with a clear picture, then choose the work your roof needs.
Look beyond
the top layer.
A roof is more than tiles or a roll of membrane. Substrate, drainage and junctions belong in the same conversation. Explore the work that fits your situation.

Roof repair in Amsterdam
A damp ceiling, slipped tile or failed flashing? A focused roof assessment helps identify the source and separate a local repair from wider renewal.
Explore the options ↗
Flat roof repair and renewal
Considering bitumen or EPDM for an Amsterdam flat roof? Start with the substrate, drainage, insulation and junctions before choosing a covering.
Explore the options ↗
Tiled roof repair and renovation
Assess roof tiles, ridge details, underlay and junctions together. Plan a targeted repair or a more complete tiled roof renovation in Amsterdam.
Explore the options ↗What does your roof need?
Repair where possible.
Renew where needed.
| Approach | When to consider it | What to establish |
|---|---|---|
| Local repair | A defined defect, with serviceable surrounding material. | Cause, access and connection to existing materials. |
| Flat roof renewal | Wider wear or a planned change to the roof build-up. | Substrate, drainage, upstands and membrane choice. |
| Tiled roof renovation | Work on tiles and possibly the layers beneath. | Reuse, battens, underlay, ridge and visible finish. |
This is a discussion guide, not a remote diagnosis. A limited repair may be sufficient.
How to compare roof quotes ↗Amsterdam.
No two roofs alike.
A rear roof in the Jordaan, a shared tiled roof in Zuid, an extension in West. The building shapes the approach. Access and authorisation belong in the first conversation.
Explore the areas ↗A better question.
A better conversation.

How to document a roof leak
Make your roof leak enquiry useful with safe photographs, a record of when the damp appears and details of the roof and access.
Explore the options ↗
EPDM or bitumen: what should you compare?
Compare EPDM and bitumen by looking at existing layers, roof shape and junctions. Neither material is the right answer for every roof.
Explore the options ↗
Compare roof quotations in five parts
Check area, roof build-up, junctions, access and written arrangements so you can see what each roof quotation actually includes.
Explore the options ↗Good to know.
Does 247 mean a round-the-clock service?
No. 247 is part of our name and domain. Contact and visit arrangements are agreed individually; this website does not promise a 24-hour service.
Can I send photographs first?
Yes, through WhatsApp. Take photographs only from a safe position and include your postcode and a short explanation. Pictures do not replace a roof inspection.
Will the roof planner give me a price?
No. It summarises dimensions, material preference and condition. Pricing also requires assessment of the substrate, access and scope.
Can I enquire on behalf of a VvE?
Yes. Mention your role, the contact person and any decisions already made. An enquiry does not authorise work on the building.
From a roof question
to a clear plan.
A good plan starts at the top.
Schematic view. Actual roof construction requires an on-site assessment.
What kind of roof is it?
Choose the roof section your enquiry concerns. It is fine if you are not sure yet.